Bendigo Hospital

The Brief

In 2013, the Victorian Government, in partnership with Exemplar Health and Bendigo Health, undertook a major $630 million project to build a new world class healthcare facility to support regional Victoria.

ENGIE was engaged to source and integrate the audio visual systems for the new Bendigo Hospital which features 372 inpatient beds, 72 same-day beds, 11 operating theatres, 42 meeting spaces, digital signage, patient information services, and a conference facility.

The Solution

ENGIE worked with various supply partners including CHW Consulting and Lendlease to identify and deploy the most advanced and functional AV technology for the Bendigo Hospital Project. The solutions implemented offer the best technical features and are future-proofed with value driven systems.

ENGIE implemented a standout solution built with Crestron technology, that delivered a unified platform for seamless management and support.

Touch panels were deployed to make it easier for healthcare professionals to configure spaces which makes for a more efficient working environment. The new control systems allow for easy use through the panels brightness, resolution, fast touch response and greater flexibility and control.

Having all equipment outfitted in a standardised way allows hospital staff to easily control technology and systems across operating theatres, wards, meeting rooms and departments.

The facilities video and teleconferencing technology links Bendigo Hospital with other regional hospitals such as Swan Hill and Mildura. Healthcare professionals can perform an array of functions with the technology, such as display radiology or pathology results on screens within the hospital, as well as the screens of other hospitals.

The Benefit

ENGIE’s working relationship with Exemplar Health and Lendlease, proved that the final product maintained the expected level of excellence set out by Bendigo Health. This helped set a firm foundation for project delivery and helped maintain a strong relationship between the project stakeholders, allowing any problems to be dealt with promptly and efficiently. ENGIE provided an Account Manager, Project Manager and team of Installers and Technicians throughout this project, as well as providing a continuing Service team well after the job was completed.

ENGIE Engineers excelled in providing new and intuitive control technology that make it easier for healthcare professionals to configure customised spaces. In particular, the Digital Operating Theatre allows the head surgeon in each operation to select the preferred pre-sets and layouts based on the type of operation and the equipment intended to be brought into the theatre.

The ease of use and enhanced collaboration has improved communication and information sharing among healthcare professionals and has translated to smarter patient care. The new Bendigo Hospital incorporates the latest Audio Visual design and technology solutions into a tranquil and caring environment to provide treatment across the entire life span, from pre-natal to aged care.
CJ-0467 ENGIE project slider background
InAVation Awards Technology Finalist 2019
Source & integrate the audio visual systems for the new hospital
Solution built with Crestron technology – unified platform for seamless management & support

Contact Us

Building a new healthcare facility is complicated – you need partners with specialist expertise. We have unmatched expertise integrating robust AV systems into clinical environments, get in touch and let us show you how.




    Projects

    Knight Frank Solar
    Knight Frank Solar upgrade
    Melbourne, Victoria
    Solar PV upgrade supports first 6-star NABERS rating for a Victorian commercial building
    Commonwealth Bank Solar
    Commonwealth Bank National Solar Rollout
    Various locations across Australia
    ENGIE is helping CBA meet their target to achieve 100% zero net carbon emissions by 2030
    Porsche Solar
    Solar-powered EV charging infrastructure for Porsche
    Melbourne, Victoria
    Solar-powered EV charging infrastructure for Porsche
    Springfield Tower’s Solar Rooftop System
    Springfield Tower's Solar Rooftop System
    Greater Springfield, QLD
    Our ENGIE Better Cities team have delivered the first solar rooftop system on the Springfield Tower in Greater Springfield, as part of our 50-year Strategic Alliance to become a net-zero energy city.
    Tanderrum Bridge Electrical Fitout
    Tanderrum Bridge Electrical Fitout
    Melbourne, Victoria
    Tanderrum Bridge was part of Stage 2 of the Melbourne Park Redevelopment, which was designed to provide an unbroken pedestrian link from Flinders Street Station to Melbourne Park.
    Frankston Civic Centre Multi-Technical Upgrade
    Frankston Civic Centre Multi-Technical Upgrade
    Frankston, Victoria
    Frankston City Council engaged ENGIE to undertake an end-of-life upgrade of the council’s Civic Centre DX cooling, heating and building controls systems. ENGIE was able to provide multi-technical services.
    ENGIE Solar Pilot Plant
    ENGIE Electrical and Communications HQ
    Fairfield, Melbourne
    The Solar Pilot Plant at ENGIE’s Fairfield headquarters was the first design & installation project for the newly created ENGIE Electrical and Communications team.
    David Jones Electrical Fit Out
    David Jones Corporate Campus Electrical Fit Out
    Burnley, Melbourne
    David Jones has relocated its central headquarters from Sydney to a purpose-built corporate campus for their iconic retailers David Jones and Country Road Group, in Melbourne’s fashion district.
    Orygen Audio-Visual Fit Out
    Orygen Audio-Visual Fit Out
    Melbourne, Victoria
    Orygen had a vision to create a state-of-the-art clinical, education, training and research space. ENGIE were engaged by Orygen in 2019 to complete the audio visual fit out at their new facility in Melbourne.
    Avalon International Airport Fitout
    Avalon International Airport Fitout
    Geelong, Victoria
    ENGIE helped Avalon Airport to become Victoria’s second international airport with a new $40m terminal catering for customs and security requirements of international flights, retail and duty-free space.
    Casey Hospital Expansion Project
    Casey Hospital Expansion Project
    Melbourne, Victoria
    A recent 13,000m² expansion of Casey Hospital enables provider Monash Health to treat 25,000 patients, perform an extra 8,000 procedures and support 1,300 births annually.
    Bravura Solutions Office Fitout
    Bravura Solutions Office Fitout
    Melbourne, Victoria
    When Bravura Solutions, a leading global supplier of software and professional services, needed a technology partner for their new Melbourne office, ENGIE was selected as the successful integrator.
    Bendigo Hospital
    Bendigo Hospital
    Bendigo, Victoria
    In 2013, the Victorian Government, in partnership with Exemplar Health and Bendigo Health, undertook a major $630 million project to build a new world class healthcare facility.
    Melbourne Airport Video Display Wall
    Melbourne Airport Video Display Wall
    Melbourne, Victoria
    ENGIE Services was employed to design and construct an 85 Metre 2.5mm pixel pitch LED video display wall, encompassing the baggage return carousel at Melbourne Airports International Baggage Claim No 8.
    Freshwater Place Digital Artwork Display
    Freshwater Place Digital Artwork Display
    Melbourne, Victoria
    ENGIE were engaged by JLL to create a Digital Artwork Display using LED to showcase immersive content and create a high tech but nature-driven aesthetic at one of Melbourne’s premier business addresses
    Wood & Grieve Engineers Office Refurbishment
    Wood & Grieve Engineers Office Refurbishment
    Melbourne, Victoria
    Wood & Grieve Engineers (WGE) are a leading multi-discipline building services engineering company and due to consistent growth came to market for their office refurbishment in late 2017.
    Monash University Moot Court
    Monash University Moot Court
    Melbourne, Victoria
    ENGIE Services was engaged by Monash University to integrate and commission the Audio Visual equipment for a Moot Court to the Monash eSolutions system designed by Peter MacLean.
    Alfred Health Centre For Health Innovation (CHI)
    Alfred Health Centre For Health Innovation (CHI)
    Melbourne, Victoria
    ENGIE was engaged by Alfred Health to deliver an AV upgrade to their Centre for Health Innovation (CHI), where clinical staff and students develop skills and practice procedures.
    Tabcorp High-Tech Office Fitout
    Tabcorp Melbourne Office
    Collins Street, Melbourne
    ENGIE was invited to provide a tender response for the Tabcorp Project. The brief was to provide a state-of the-art electrical services installation which met the direction provided by Tabcorp, JLL PDS, ECM & PTID.
    Fire Protection Across States: Murraylink Electricity
    Fire Protection Across States: Murraylink Electricity
    Red Cliffs, Victoria to Berri, SA
    Murraylink is a 180km long, high voltage direct current electricity transmission link between Red Cliffs in Victoria and Berri in South Australia, connecting the electricity grids of both states.
    Woodside Head Office Fitout
    Woodside Capital Square Tower 1
    Perth, WA
    Woodside had been at its Perth location since 2004 and given the age of the existing fit out, the company needed a state-of-the-art base to accommodate their requirements for the future.
    Optus Stadium Perth CCTV System Installation
    Optus Stadium Perth CCTV System Installation
    Burswood, Perth
    Perth’s Optus Stadium is a 60,000 seat, world class, multi-purpose stadium located east of the Perth CBD, on the Burswood Peninsula. ENGIE Services was engaged to install the state-of-the-art CCTV system.
    Four Seasons Hotel Sydney Boot Scheme Upgrade
    Four Seasons Hotel Sydney Boot Scheme Upgrade
    Sydney, NSW
    The Four Seasons Hotel Sydney Energy Efficiency Upgrade (BOOT Scheme) comprised the upgrade of the hotel’s mechanical plant room that dated back to 1981 – when the landmark hotel was built.
    Perth Children’s Hospital Communications System
    Perth Children's Hospital Communications System
    Nedlands, Perth
    When Schneider sought a new contractor to support their work during construction of the Perth Children’s Hospital, it provided ENGIE Services with the opportunity to take on a very large and complex project.