The project brief was to provide a state-of the- art electrical services installation which meets the direction provided by Tabcorp, JLL PDS, ECM and PTID. Key features included a centralised main communications room, upgrade of power distribution to the floors for both the general uninterruptible power supply and generator, fit out of a fully functioning TV studio, executive area, technical R&D areas and general and feature lighting throughout.
The Solution
ENGIE was invited by JLL to provide a fixed lump sum tender response for the Tabcorp Project. The tender period was short and intense. A considerable amount of due diligence and scope clarity was completed to provide the most cost effective and comprehensive price to JLL. Alongside a conforming tender response ENGIE provided a substantial alternative value management package to help maintain the client’s budget integrity.ENGIE completed an internal lighting control, lighting layout and fitting selection redesign, along with an alternate N+1 UPS and hot aisle containment system. A substantial cable containment and support system update was also provided.
The Benefit
Tabcorp Holdings Limited is an Australian wagering, gaming and Keno operator and one of the world’s largest publicly listed gaming companies. Moving away from high-end fixtures and fittings, the business placed a huge emphasis on high-tech. 87 Rooms are AV-enabled, 36 TVs measuring almost 40m side-by-side were installed (just a few meters short of the height of the Statue of Liberty). These TVs made up 4 large video walls set up in reception, system operations, race day and command centre. Approximately 225km of Siemon CAT 6a cable were installed to thousands of devices. The new main communications room now also includes three world class digital IP radio studios and 2 state-of-theart virtual TV studios.
87 rooms are AV-enabled & 36 TVs measuring almost 40m side-by-side were installed
Contact Us
If you’re undertaking a major construction project and need a reliable partner for a electrical and communications fit-out, we can help. Get in touch today to discuss our huge range of services and ways we can add additional value to your project.
Projects
High-tech mobile learning centre for the University of Tasmania
Tasmania
We worked with the University of Tasmania to develop an innovative mobile learning vehicle to bring state-of-the-art education to regional Tasmania.
We’ve signed a new 10-year energy agreement with Springfield Hyundai to drive the transition to green energy consumption at the site and provide operational cost savings.
Our ENGIE Better Cities team have delivered the first solar rooftop system on the Springfield Tower in Greater Springfield, as part of our 50-year Strategic Alliance to become a net-zero energy city.
Tanderrum Bridge was part of Stage 2 of the Melbourne Park Redevelopment, which was designed to provide an unbroken pedestrian link from Flinders Street Station to Melbourne Park.
Frankston City Council engaged ENGIE to undertake an end-of-life upgrade of the council’s Civic Centre DX cooling, heating and building controls systems. ENGIE was able to provide multi-technical services.
The Solar Pilot Plant at ENGIE’s Fairfield headquarters was the first design & installation project for the newly created ENGIE Electrical and Communications team.
David Jones has relocated its central headquarters from Sydney to a purpose-built corporate campus for their iconic retailers David Jones and Country Road Group, in Melbourne’s fashion district.
Orygen had a vision to create a state-of-the-art clinical, education, training and research space. ENGIE were engaged by Orygen in 2019 to complete the audio visual fit out at their new facility in Melbourne.
ENGIE helped Avalon Airport to become Victoria’s second international airport with a new $40m terminal catering for customs and security requirements of international flights, retail and duty-free space.
A recent 13,000m² expansion of Casey Hospital enables provider Monash Health to treat 25,000 patients, perform an extra 8,000 procedures and support 1,300 births annually.
When Bravura Solutions, a leading global supplier of software and professional services, needed a technology partner for their new Melbourne office, ENGIE was selected as the successful integrator.
In 2013, the Victorian Government, in partnership with Exemplar Health and Bendigo Health, undertook a major $630 million project to build a new world class healthcare facility.
ENGIE Services was employed to design and construct an 85 Metre 2.5mm pixel pitch LED video display wall, encompassing the baggage return carousel at Melbourne Airports International Baggage Claim No 8.
ENGIE were engaged by JLL to create a Digital Artwork Display using LED to showcase immersive content and create a high tech but nature-driven aesthetic at one of Melbourne’s premier business addresses
Wood & Grieve Engineers (WGE) are a leading multi-discipline building services engineering company and due to consistent growth came to market for their office refurbishment in late 2017.
ENGIE Services was engaged by Monash University to integrate and commission the Audio Visual equipment for a Moot Court to the Monash eSolutions system designed by Peter MacLean.
ENGIE was engaged by Alfred Health to deliver an AV upgrade to their Centre for Health Innovation (CHI), where clinical staff and students develop skills and practice procedures.
ENGIE was invited to provide a tender response for the Tabcorp Project. The brief was to provide a state-of the-art electrical services installation which met the direction provided by Tabcorp, JLL PDS, ECM & PTID.
Fire Protection Across States: Murraylink Electricity
Red Cliffs, Victoria to Berri, SA
Murraylink is a 180km long, high voltage direct current electricity transmission link between Red Cliffs in Victoria and Berri in South Australia, connecting the electricity grids of both states.
Woodside had been at its Perth location since 2004 and given the age of the existing fit out, the company needed a state-of-the-art base to accommodate their requirements for the future.
Perth’s Optus Stadium is a 60,000 seat, world class, multi-purpose stadium located east of the Perth CBD, on the Burswood Peninsula. ENGIE Services was engaged to install the state-of-the-art CCTV system.
The Four Seasons Hotel Sydney Energy Efficiency Upgrade (BOOT Scheme) comprised the upgrade of the hotel’s mechanical plant room that dated back to 1981 – when the landmark hotel was built.
When Schneider sought a new contractor to support their work during construction of the Perth Children’s Hospital, it provided ENGIE Services with the opportunity to take on a very large and complex project.